FANDOM


Dolgoch2011
Dolgoch
  • Number: 2
  • Primary function: Passenger service
  • Built: 1866
  • Builder: Fletcher, Jennings and Co.
  • Gauge: 2ft 3in
  • Configuration: 0-4-0WT
  • Driving wheel diameter: 2' 4"
  • Coupled wheelbase: 6' 6"
  • Total wheelbase: 6' 6"
  • Cylinder size (bore/stroke): 7.625 x 16"
  • Heating surface: 128 sq. ft.
  • Working pressure: 150 psi
  • Tractive effort: 4236 lbs
  • Weight: 10.25 tons
  • Length over buffers: 17' 5"

Dolgoch was built in 1866 by Fletcher, Jennings & Co., but to a very different design to that of Talyllyn. He is an 0-4-0 tank engine with both a back tank (behind the cab) and a well tank (between the frames). The long wheelbase allows the firebox to sit in front of the rear axle, with Fletcher's Patent inside valve gear driven off the front axle, a particularly inaccessible arrangement. In increasingly decrepit condition Dolgoch continued to operate the service single-handedly until 1952 when Edward Thomas became available and was then the subject of a prolonged overhaul between 1954 and 1963.

Dolgoch returned to service in late 1999 after a major overhaul involving firebox repairs and an extensive mechanical overhaul; as part of the overhaul he has been fitted with air braking equipment, the last steam loco on the Talyllyn Railway to be fitted.

Dolgoch is Rheneas's twin, and because of this he was mentioned multiple times in the Railway Series.

Livery

Dolgoch previously ran in his 1946 light green livery. As of 2011 he is running in Crimson Lake livery.

Overhaul and Appeal

During Autumn 2009, the Talyllyn Railway booked Dolgoch for an overhaul. To ensure that Dolgoch was repaired by May 2011, which marked the 60th anniversary of railway preservation, "Steam Railway" magazine launched an appeal to raise funds for Dolgoch's next overhaul, which includes a new boiler to its original design. However, whilst the appeal was being made, an examination of Dolgoch showed that he had a crack in his rear tubeplate, which forced him to be withdrawn for overhaul earlier than expected. Luckily though, by January 2010, thanks to the readers of "Steam Railway" magazine, the Dolgoch appeal was so successful that the overhaul was able to commence. During the second week in February, Dolgoch was dismantled for the removal of his boiler from his frames. Then, his boiler was lifted from his frames on February 23rd, 2010.

On March 22nd, 2011, Dolgoch's new boiler, built in the Severn Valley Railway's Boiler Shop in Bridgnorth, was completed with a new smokebox and passed its steam test eleven days after. On April 28th, 2011, the boiler was back at the Talyllyn Railway for Dolgoch's overhaul to be completed. Following completion of his overhaul, Dolgoch is now back in working service and attended the 60th anniversary of railway preservation on May 14th, 2011.

Appearances

The Railway Series

Gallery

Talyllyn Railway
TalyllynDolgochSir HaydnEdward ThomasMidlanderDouglasTom RoltAlf

Ad blocker interference detected!


Wikia is a free-to-use site that makes money from advertising. We have a modified experience for viewers using ad blockers

Wikia is not accessible if you’ve made further modifications. Remove the custom ad blocker rule(s) and the page will load as expected.